16.3.2. Wake migration

When a task that was previously idle becomes ready to run, the scheduler must decide which cluster executes the task. To choose between big and LITTLE, big.LITTLE MP uses the tracked load history of a task. Generally, the assumption is that the task resumes on the same cluster as before. The load metric is not updated for a task that is sleeping. Therefore, when scheduler checks the load metric of a task at wake up, before choosing a cluster to execute it on, the metric has the value it had when the task last ran. This property means that tasks that are sufficiently busy always tend to wake up on a big core. An audio playback task, for example, is periodically busy. But this is typically an undemanding task, so the overall load may fit comfortably on a little core. A task has to actually modify its behavior to change cluster.

Figure 16.5. Wake migration on a big core

To view this graphic, your browser must support the SVG format. Either install a browser with native support, or install an appropriate plugin such as Adobe SVG Viewer.


Figure 16.6. Wake migration on a LITTLE core

To view this graphic, your browser must support the SVG format. Either install a browser with native support, or install an appropriate plugin such as Adobe SVG Viewer.


If a task modifies its behavior, and the load metric has crossed either of the up or down migration thresholds, the task can be allocated to a different cluster. Figure 16.5 and Figure 16.6 illustrate this process. Rules are defined that ensure that big cores generally only run a single intensive thread and run it to completion, so upward migration only occurs to big cores which are idle. When migrating downwards, this rule does not apply and multiple software threads can be allocated to a little core.

Copyright © 2015 ARM. All rights reserved.ARM DEN0024A