12.7 Energy Probe data in Streamline

After you have successfully setting up the Energy Probe and have run a capture session, you can see the Energy Probe data aligned to the software activity in the Timeline view of Streamline

If your target meets the requirements, and you have attached a power probe point that closely resembles the activity of the CPU cores using Channel 0, the Streamline correlation algorithm aligns the data for you. Notes in the warnings tab communicate any limitations or failures in this area.

When you have set up everything correctly, run a standard report capture and analysis. A large variance between idle and activity ensures that the correlation algorithm has something to lock onto, so set your workloads accordingly. If you have connected and configured your Energy Probe correctly, a power chart now appears in the Timeline view.

Figure 12-5 Energy Probe data in the Timeline view

Energy Probe data in the Timeline view

Related concepts
Energy Probe overview
Related tasks
Setting up Energy Probe
Adding the caiman application to Streamline
Related reference
Energy Probe requirements
Non-ConfidentialPDF file icon PDF versionARM DUI0482M
Copyright © 2010-2013 ARM. All rights reserved.